Friday, 10 August 2012

Weedon to (nearly) Braunston

P1010860
Onwards again on another hot and sunny mooring to visit the chandleries at Whilton before ascending Buckby locks with a very experienced timeshare boat crew.
P1010866
After lunch we stopped in the tree lined cutting leading into Braunston Tunnel to escape the worst of the afternoon’s heat and catch up with a little painting.

No comments:

Post a Comment